ARMY TM 5-5420-212-10-1
MARINE CORPS TM 08676A-10/1-1
TABLE 7-1. (contd) Building and Boom Table - 2E + 13 through 2E + 17 Bay Link Reinforced (Normal Site)
NOTES:
a.
Add LNCG posts, LNCG and nose roller.
b.
Stop boom/launch to add long or short links, light tackle and anti-flutter as required.
c.
Check the LR is under the LZ given or higher. Remove nose sections as they pass LRP, observing minimum
5 ft (1.5 m) overhang.
Leave last three nose sections in place until far bank end of bridge has been lowered to ground.
d.
Boom to 6 ft (1.8 m) from A peg or ETP overhangs CRB by min. 1.5 ft (0.5 m).
e.
Install ex FRB in front of CRB and then reposition LRP 12 ft (3.6 m) from A peg.
f.
Launch to required far bank bearing or until end of ETP overhangs ex FRB by 1.5 ft (0.5 m).
g.
Put bridge on ground.
*
Add given length of launching nose with LRP secured with tie-down strap.
**
Nose completed by adding further LNHs.
( )
Center of gravity.
7-3