TABLE 7-3. (contd) Delaunch Table - 2E + 13 through 2E + 17 Bay Link Reinforced
NOTES:
a.
Remove curbs, ramps and deck units.
b.
Position ex. FRB under bridge min.1.5 ft (0.5 m) from end.
c.
Add LNCG posts, LNCG, nose roller and install launching nose, then reposition LRP 12 ft from A peg.
d.
Delaunch bridge until far BSB is 6 ft (1.8 m) from A peg or end of ETP overhangs CRB by min. 1.5 ft (0.5 m)
e.
Reposition LRP against A peg and then remove ex. FRB.
f.
Stop boom/delaunch to remove long or short links, light tackle, anti-flutter and add launching noses as
required, observing minimum 5 ft (1.5 m) overhang.
g.
Disassemble FRB and RRB. Clear site.
*
Remove remainder of launching nose, LNCG, LNCG posts and nose roller.
( )