ARMY TM 5-5420-212-10-1
MARINE CORPS TM 08676A-10/1-1
TABLE 7-5. (contd) Delaunch Table - 2E + 13 through 2E + 17 Bay Link Reinforced
(Normal Site - Original Far Bank)
Bridge ft
108
114
120
126
132
Length m
32.9
34.8
36.6
38.4
40.2
2E+No. Bays
13
14
15
16
17
L/Nose
7N1
7N1
7N1
8N1
8N1
V Distance
ft
118.6
124.9
129.1
136.7
142.6
m
36.16
38.06
39.36
41.66
43.46
Boom
1p7
lp7
1p7
1p7
lp7
Remove
TP7,BP6,7N1
TP7,BP6,7N1
TP7,BP6,7N1
TP8,BP7,8N1
TP8,BP7,8N1
TP6,BP5
TP6,BP5
TP6,BP5
TP7,BP6,7N1
TP7,BP6,7N1
TP5,BP4,6N1*
TP5,BP4,6N1*
TP5,BP4,6N1*
TP6,BP4,6N1*
TP6,BP4,6N1*
Boom
2p0
2p0
2p0
2p0
2p0
Remove
Pin at A
Pin at A
Pin at A
Pin at A
Pin at A
Boom
1p4
1p4
1p4
1p4
1p4
Remove
TP4,BP3
TP4,BP3
TP4,BP3
TP4,BP3
TP4,BP3
TP3,BP2
TP3,BP2
TP3,BP2
TP3,BP2
TP3,BP2
Boom
Bp0
Bp0
Bp0
Bp0
Bp0
Remove
TP2,1
TP2,1
TP2,1
TP2,1
TP2,1
Boom
Bp2
Bp2
Bp2
Bp2
Bp2
Remove
E
E
E
E
E
Complete by:
Note i
Note i
Note i
Note i
Note i
NOTES:
a.
Remove curbs, ramps and deck units.
b.
Skid bridge to correct bearing.
c.
Position ex FRB under bridge 3 ft (0.9 m) from new A peg. Bridge should overhang ex FRB min. 1.5 ft (0.5
m)
d.
Position CRB next to ex FRB.
e.
Add LNCG posts, LNCG, nose roller and install launching nose, then reposition LRP 12 ft from A peg.
f.
Delaunch bridge until far BSB is 6 ft (1.8 m) from A peg or end of ETP overhangs CRB by minimum 1.5 ft (0.5
m)
g.
Reposition LRP against new A peg and then remove ex. FRB.
h.
Stop boom/delaunch to remove long or short links, light tackle, anti-flutter and add launching noses as
required, observing minimum 5 ft (1.5 m) overhang.
i.
Disassemble FRB and RRB. Clear site.
*
Remove entire launching nose, LNCG, LNCG posts and nose roller.
( )
Center of gravity.
7-11