ARMY TM 5-5420-212-10-1MARINE CORPS TM 08676A-10/1-1TABLE 7-5. (cont’d) Delaunch Table - 2E + 13 through 2E + 17 Bay Link Reinforced(Normal Site - Original Far Bank)Bridge ft108114120126132Length m32.934.836.638.440.22E+No. Bays1314151617L/Nose7N17N17N18N18N1V Distanceft118.6124.9129.1136.7142.6m36.1638.0639.3641.6643.46Boom1p7lp71p71p7lp7RemoveTP7,BP6,7N1TP7,BP6,7N1TP7,BP6,7N1TP8,BP7,8N1TP8,BP7,8N1TP6,BP5TP6,BP5TP6,BP5TP7,BP6,7N1TP7,BP6,7N1TP5,BP4,6N1*TP5,BP4,6N1*TP5,BP4,6N1*TP6,BP4,6N1*TP6,BP4,6N1*Boom2p02p02p02p02p0RemovePin at APin at APin at APin at APin at ABoom1p41p41p41p41p4RemoveTP4,BP3TP4,BP3TP4,BP3TP4,BP3TP4,BP3TP3,BP2TP3,BP2TP3,BP2TP3,BP2TP3,BP2BoomBp0Bp0Bp0Bp0Bp0RemoveTP2,1TP2,1TP2,1TP2,1TP2,1BoomBp2Bp2Bp2Bp2Bp2RemoveEEEEEComplete by:Note iNote iNote iNote iNote iNOTES:a.Remove curbs, ramps and deck units.b.Skid bridge to correct bearing.c.Position ex FRB under bridge 3 ft (0.9 m) from new A’ peg. Bridge should overhang ex FRB min. 1.5 ft (0.5m)d.Position CRB next to ex FRB.e.Add LNCG posts, LNCG, nose roller and install launching nose, then reposition LRP 12 ft from A peg.f.Delaunch bridge until far BSB is 6 ft (1.8 m) from A peg or end of ETP overhangs CRB by minimum 1.5 ft (0.5m)g.Reposition LRP against new A peg and then remove ex. FRB.h.Stop boom/delaunch to remove long or short links, light tackle, anti-flutter and add launching noses asrequired, observing minimum 5 ft (1.5 m) overhang.i.Disassemble FRB and RRB. Clear site.*Remove entire launching nose, LNCG, LNCG posts and nose roller.( )Center of gravity.7-11
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business