ARMY TM 5-5420-212-10-1
MARINE CORPS TM 08676A-10/1-1
8-5.
END TAPER PANEL, BANKSEAT BEAM, JUNCTION PANEL, TOP PANEL, BOTTOM PANEL, LAUNCHING
NOSE HEAVY (Resilient Mount)
This task covers:
a.
Removal
b.
Service/Repair
c.
Installation
INITIAL SETUP:
Tools Required
8 inch pliers
Drift pin
1 lb ball peen hammer
6 inch screwdriver
Materials Required
Clean cloths
Crocus cloth (25, Appendix D)
Equipment Conditions
Resilient mount in component.
Component in upright position on raised, flat surface.
No obstruction under bushing.
a.
Removal
(1)
Straighten prongs of cotter pin (1) with pliers and screwdriver
(2)
Remove cotter pin (1) from pin (2) with pliers.
(3)
Push on end of pin (2) until head of pin can be grasped, then pull pin from resilient mount (3) and
housing (4).
8-10