ARMY TM 5-5420-212-10-1MARINE CORPS TM 08676A-10/1-18-5.END TAPER PANEL, BANKSEAT BEAM, JUNCTION PANEL, TOP PANEL, BOTTOM PANEL, LAUNCHINGNOSE HEAVY (Resilient Mount)This task covers:a.Removalb.Service/Repairc.InstallationINITIAL SETUP:ToolsRequired8 inch pliersDrift pin1 lb ball peen hammer6 inch screwdriverMaterialsRequiredClean clothsCrocus cloth (25, Appendix D)EquipmentConditionsResilient mount in component.Component in upright position on raised, flat surface.No obstruction under bushing.a.Removal(1)Straighten prongs of cotter pin (1) with pliers and screwdriver(2)Remove cotter pin (1) from pin (2) with pliers.(3)Push on end of pin (2) until head of pin can be grasped, then pull pin from resilient mount (3) andhousing (4).8-10
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business