TM 5-5420-226-20-2
MANIFOLD HEATER INPUT SOLENOID VALVE AND FUEL LINE REPLACEMENT (Sheet 6 of 10)
Input Solenoid Valve Replacement (Sheet 1 of 5)
PROCEDURE INDEX
PROCEDURE
PAGE
Removal
Installation
TOOLS:
7/16 in. combination box and open end wrench
1/2 in. combination box and open end wrench
5/8 in. combination box and open end wrench
5/16 in. combination box and open end wrench
9/16 in. combination box and open end wrench
Flat-tip screwdriver
SUPPLIES:
Container to catch fuel leakage
Rags (Item 12, Appendix D)
Sealing compound (Item 28, Appendix D)
PRELIMINARY PROCEDURE:
Go on to Sheet 2
TA107875