• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
COOLING FAN SHROUD REPLACEMENT - Continued
ENGINE COOLING FAN REPLACEMENT - Continued

M48A5 Tank Chassis, Transporting: For Bridge, Armored-Vehicle-Launched; Scissoring Type, Class 60 -2 Page Navigation
  716    717    718    719    720  721  722    723    724    725    726  
img
. . .
TM 5 - 5 4 2 0 - 2 2 6 - 2 0 - 2
ENGINE COOLING FAN REPLACEMENT (Sheet 1 of 4)
PROCEDURE INDEX
PAGE
PROCEDURE
9-55
Removal
9-57
Installation
Thickness gage (feeler gage)
TOOLS:
Torque wrench (0-1751b-ft)
Ratchet with l/2 in. drive
9/16 in. socket with 1/2 in. drive
1/2 in. socket with 1/2 in. drive
1/2 in. combination box and open end wrench
Slip joint pliers
Hammer
1-1/4 in. socket with 1/2 in. drive
Cotter pins (18 required)
SUPPLIES:
2x4 in. block of wood 6 in. long
Remove top deck ( page 16-21)
PRELIMINARY
PROCEDURE:
Do not drop screws and Iockwashers into fan assembly.
TA108009
Go on to Sheet 2
9-55


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.