TM 5-5420-226-20-3
SHIFTING CONTROL BRACKET ASSEMBLY AND CONNECTING LINK
REPLACEMENT (Sheet 1 of 2)
TOOLS:
Hammer
1/8 in. drive punch
3/4 in.socket with 1/2 in. drive
2 in. extension with 1/2 in. drive
3/4 in. combination box and open end wrench (2 required)
7/16 in. combination box and open end wrench
PRELIMINARY PROCEDURE:
REMOVAL:
1.
Using 7/16 inch wrench, remove screw
(A).
2.
Using 3/4 inch socket with extension,
Go onto Sheet 2
TA169040