• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
BRACKET ASSEMBLY REPAIR
SHIFTING CONTROL BRACKET AND LINK ASSEMBLY REPAIR - Continued

M48A5 Tank Chassis, Transporting: For Bridge, Armored-Vehicle-Launched; Scissoring Type, Class 60 -3 Page Navigation
  504    505    506    507    508  509  510    511    512    513    514  
img
. . . . . . . .
TM 5-5420-226-20-3
SHIFTING CONTROL BRACKET AND LINK ASSEMBLY REPAIR (Sheet 1 of 11)
PROCEDURE INDEX
PAGE
PROCEDURE
11-42
Removal
1145
Disassembly
11-47
Inspection
11-48
Assembly
11-50
Installation
Torque wrench with 1/2 in. drive
TOOLS: 7/16 in. socket with 1/2 in. drive
(0 to 175 lb-ft) (0 to 237 Nm)
2 in. extension with 1/2 in. drive
9/16 in. crow foot adapter with
5 in. extension with 1/2 in. drive
1/2 in. drive
Ratchet with 1/2 in. drive
3/4 in. punch
1/8 in. pin punch
5/16 in. combination box and open
Hammer
end wrench
9/16 in. combination box and open end
1/4 in. combination box and open end
wrench (2 required)
wrench
3/4 in. combination box and open end wrench
6 in. rule
7/16 in. combination box and open end wrench
1/2 in. punch
9/16 in. socket with 1/2 in. drive
Vise
Grease gun
9/16 in. crowfoot adapter with 3/8 in. drive
Grease (Item 37, Appendix D)
SUPPLIES:
Pencil (Item 79, Appendix D)
Paper (Item 80, Appendix D)
Lockwashers (8 required)
TM 5-5420-226-10
REFERENCE:
Block tracks to prevent vehicle movement (TM 5-5420-226-10)
PRELIMINARY PROCEDURES:
Remove powerplant (page 5-2)
Go on to Sheet 2
Change 3
11-42


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.