TM 5-5420-226-20-3
SHIFT LINKAGE ADJUSTMENT (Sheet 6 of 28)
Using 9/16 inch wrench, install screw (R)
15.
through link (U) and shifting rod bearing
end (T).
16.
Holding rod bearing ends (T) and (X) with
9/1 6 inch wrench, use torque wrench and
9/16 inch crowfoot adapter to tighten jam-
nuts (P) and (Q) to 16-18 lb-ft (22-24 Nm).
Remove locating pin (L) from alinement holes in bracket (M) and link (N).
17.
18.
Using torque wrench and 9/16 inch socket, tighten screw (R) to 16-18 lb-ft (22-24 Nm)
and go to step 39.
19.
Using 9/16 inch wrench, adjust shifting rod bearing end (T) clockwise until shifting rod (S)
is past hole (W).
20.
Using 9/16 inch wrench, remove screw (Y).
21.
Using 9/16 inch wrench, install screw (R) through link (U) and shifting rod bearing end (T).
22.
Holding rod bearing end (T) with 9/16 inch wrench, use torque wrench and 9/16 inch
crow foot adapter to tighten jamnut (Q) to 16-18 lb-ft (22-24 Nm).
Using torque wrench and 9/16 inch socket, tighten screw (R) to 16-18 lb-ft (22-24 Nm).
23.
Go on to Sheet 7
TA169059
11-58