TM 5-5420-226-20-3
SHIFT LINKAGE ADJUSTMENT (Sheet 8 of 28)
FORWARD INBOARD
DRIVER'S
LINK ASSEMBLY
STATION
29.
Using 9/16 inch wrench, remove screw (Y) and
remove shifting rod bearing end (X) from
clevis (Z).
Using 9/16 inch wrench, adjust shifting rod
30.
bearing end (X) clockwise until shifting rod
(S) is past hole (V).
31.
Using 9/16 inch wrench, install screw (Y) through clevis (Z) and shifting rod bearing
end (X).
32.
Holding rod bearing end (X) with 9/16 inch wrench, use torque wrench and 9/16 inch
crow foot adapter to tighten jamnut (P) to 16-18 lb-ft (22-24 Nm).
33.
Using torque wrench and 9/16 inch socket, tighten screw (Y) to 16-18 lb-ft (22-24 Nm).
34.
Using 9/16 inch wrench, adjust shifting rod bearing end (T) by turning clockwise or counter-
clockwise until screw (R) will slide freely through clevis (U) and shifting rod bearing
end (T).
35.
Using 9/16 inch wrench, install screw (R) through clevis (U) and shifting rod bearing
end (T).
36.
Holding rod bearing end (T) with 9/16 inch wrench, use torque wrench and 9/16 inch
crow foot adapter to tighten jamnut (Q) to 16-18 lb-ft (22-24 Nm).
37.
Remove locating pin (L) from alinement holes.
Using torque wrench and 9/16 inch socket, tighten screw (R) to 16-18 lb-ft (22-24 Nm).
38.
Go on to Sheet 9
TA169061
11-60