• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
UNIVERSAL JOINT REPLACEMENT
UNIVERSAL JOINT REPLACEMENT - Continued

M48A5 Tank Chassis, Transporting: For Bridge, Armored-Vehicle-Launched; Scissoring Type, Class 60 -3 Page Navigation
  583    584    585    586    587  588  589    590    591    592    593  
img
.
TM 5-5420-22620-3
UNIVERSAL JOINT REPLACEMENT (Sheet 2 of 7)
REMOVAL:
NOTE
Turn quick-disconnect clamp until it
is in working position.
1. Using cutting pliers, cut locking wire (A).
2. Using extension and 3/4 inch socket, remove
screw (B).
3. Open quick-disconnect clamp (C).
4. Remove quick-disconnect clamp (C).
5. Check quick-disconnect clamp (C) for cracks,
breaks, and spring hinge. Replace if
necessary.
6. Place large crowbar (D) in position to
support final drive flange (G).
7. While holding down on large crowbar (D),
use pinch bar (E) to pry final drive adapter
assembly (F) until it comes loose from final
drive flange (G).
CAUTION
Use rope capable of picking up and
holding at least 92 pounds.
8. Attach rope (H) loosely to universal joint.
Go on to Sheet 3
12-16
Change 3


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.