• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
TORSION BAR ANCHOR REPLACEMENT - Continued
TRACK SUPPORT ROLLER REPLACEMENT - Continued

M48A5 Tank Chassis, Transporting: For Bridge, Armored-Vehicle-Launched; Scissoring Type, Class 60 -3 Page Navigation
  775    776    777    778    779  780  781    782    783    784    785  
img
. . . . .
TM 5-5420-226-20-3
TRACK SUPPORT ROLLER REPLACEMENT (Sheet 1 of 10)
PROCEDURE INDEX
PAGE
PROCEDURE
14-36
Removal
14-42
Installation
3/16 in. alining punch
TOOLS:
Ratchet with 1/2 in. drive
3/8 in. punch
9/16 in. socket with 1/2in. drive
2-1/2 in. socket with 3/4 in. drive
Slide hammer puller
Hydraulic jack
Hammer
Flat-tip screwdriver
Straight punch 3/4 in. dia. 10 in. long
Ratchet with 3/4 in. drive
Pliers
Grease gun
Face wrench socket (Item 28, Chapter 3, Section I)
SPECIAL TOOLS:
Seal Inserter (Item 22, Chapter 3, Section I)
Axle remover adapter (Item 7, Chapter 3, Section I)
I
Cotter pin
SUPPLIES:
Gasket (2 required)
Grease (Item 37, Appendix D)
Rags (Item 65, Appendix D)
Seals
Nut lock
1/2 in. rod
Wooden planks 2 in. by 6 in. by 4 ft. (or metal plates)(2 required)
Wooden safety block 2 in. by 6 in. by 2 ft.
lockwashers (6 required)
Two
PERSONNEL:
REFERENCES:
TM 5-5420-226-10
LO 5-5420-226-12
Go on to Sheet 2
14-36
Change 3


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.