• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Removal of Studs Broken Above Surface
Dowel Pin Removal

Launcher Hydraulics System M48A5/M60A1 Tank Chassis, Transporting: For Bridge, Armored-Vehicle-Launched; Scissoring Type, Class 60 Page Navigation
  675    676    677    678    679  680  681    682    683    684    685  
img
.
TM 5-5420-228-24
GENERAL MAINTENANCE - Continued
Installation of New Studs
TOOLS: Screw threading set
1.
Using tap (A), clean out threads in hole (B).
2.
Using two wrenches, screw together and jam
two nuts (C) onto end of new stud (D).
3.
Using socket, loosely install new stud (D) into hole (B).
4.
Using torque wrench, tighten new stud (D) to
required value (refer to specific maintenance
procedure).
5.
Using two wrenches, remove two nuts (C)
from new stud (D).
End of Task
TA251288
C-18


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.