Table 1. Operator Preventive Maintenance Checks and Services (PMCS) for Improved Ribbon Bridge Ramp Bay (Contd).ITEM TONOT FULLYITEMCHECK/MISSIONNO.INTERVALSERVICEPROCEDURECAPABLE IF:TM 5-5420-278-100015 000015 00-1529BeforeLoad receivingpin (7), recess(8), cleat (5),and splash plate (6)a. Check pin and mounting hardwarefor cracks or if missing.b. Check recess for cracks and brokenwelds.c. Check cleat for broken welds or ifmissing.a. Pin is missing ordamage preventsuse.NOTEPerform items 29 through 36from top of ramp bay,starting at front (connectingend), proceedingcounterclockwise. (Refer tofigure 2).6578~~Figure 2. PMCS for Ramp Bay.
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business