Table 1. Operator Preventive Maintenance Checks and Services (PMCS)
for Improved Ribbon Bridge Ramp Bay (Contd).
ITEM TO
NOT FULLY
ITEM
CHECK/
MISSION
NO.
INTERVAL
SERVICE
PROCEDURE
CAPABLE IF:
TM 5-5420-278-10
0015 00
0015 00-18
34
Before
Rear lifting
lug (1) and
eyebolt (2)
Check for damage or if missing.
Missing or damaged
parts.
35
Before
Load receiving
pin (4),
recess (3),
cleat (6), and
splash plate (5)
a. Check pin and mounting hardware
for cracks or if missing.
b. Check recess for cracks and broken
welds.
c. Check cleat for broken welds or if
missing.
a. Pin is missing or
damage prevents
use.
5
3
4
6
~
~
1
2
~