Table 1. Operator Preventive Maintenance Checks and Services (PMCS)
for Improved Ribbon Bridge Ramp Bay (Contd).
ITEM TO
NOT FULLY
ITEM
CHECK/
MISSION
NO.
INTERVAL
SERVICE
PROCEDURE
CAPABLE IF:
TM 5-5420-278-10
0015 00
0015 00-19
36
Before
Right outer
ponton handrail
assemblies (7)
Check for missing or damaged
mounting hardware, rope and
deterioration of rope, snaphooks, and
if stanchion will lock in stowed and set
positions.
Missing or damaged
parts are found or
stanchion is not
operational.
CAUTION
Ensure longitudinal and
transverse couplings and
swivel hooks are engaged
before performing During
operation.
NOTE
Perform items 37 through 49
with ramp bay unfolded and
secured, starting at front
(connecting end), proceeding
counterclockwise. (Refer to
figure 3.)
Figure 3. PMCS, Ramp Bay Unfolded.
7