Table 1. Operator Preventive Maintenance Checks and Services (PMCS) for Improved Ribbon Bridge Ramp Bay (Contd).ITEM TONOT FULLYITEMCHECK/MISSIONNO.INTERVALSERVICEPROCEDURECAPABLE IF:TM 5-5420-278-100015 000015 00-2240DuringRight fluidpump cover (1),pump (3), andhoses (2)a. Check for structural damage.b. Check pump for proper fluid leveland leaks. Fill as required.c. Check pump for proper operation.a. Pump cover ismissing.b. Any Class IIIfluid leak is noted.c. Pump is notoperational.41DuringLeft fluid pumpcover (1), pump(3), and hoses(2)a. Check for structural damage.b. Check pump for proper fluid leveland leaks. Fill as required.c. Check pump for proper operation.a. Pump cover ismissing.b. Any Class IIIfluid leak is noted.c. Pump is notoperational.123NOTEPMCS for right and left fluidpump assemblies is the same.Right pump is shown.RIGHT PUMP SHOWN
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business