TM-5-5420-279-10
Position of Flatracks
4.19.1.1
Load approach ramp transport frames onto flatrack V1 and secure with straps.
4.19.1.2
Load flatrack T1 onto vehicle V3 and return to staging area.
4.19.1.3
Transload flatrack T1 onto trailer T1.
4.19.1.4
Load flatrack LVT on to vehicle V3 and return to staging area, transload flatrack LVT
onto trailer LVT.
4.19.1.5
Return vehicle V1 to bridge site, load flatrack V1 and return to staging area.
4.19.1.6
Connect trailer T1 to vehicle V1.
4.19.1.7
Load flatrack T2 onto vehicle V2 and transload flatrack T2 onto trailer T2
4.19.1.8
Load flatrack V2 onto vehicle V2.
4.19.1.9
Connect trailer T2 to vehicle V2.
4.19.1.10 Load flatrack V3 onto vehicle V3.
4.19.1.11 Connect trailer T3 to vehicle V3.
4.19.1.12 Engage the launch vehicle transmission and release the handbrake. Drive the launch
vehicle to the parked position of the launch vehicle trailer LVT.