Bridge Module Lifter Connected to Bridge Module
5.4.3.8
On the tail lift pendant, operate the LIFT UP switch to position the pinning operatives
at the optimum convenient height. Attach tag lines to either end of the module.
5.4.3.9
Remove the retaining clips and the pins connecting the two parallel modules and
place them on the tail lift platform.
Operate the lift controls on the crane, and disengage the shootbolts from the 1st and
5.4.3.10
2nd parallel modules.
Guide the 1st parallel module away from the still connected 2nd module. Place the
5.4.3.11
bridging pins in the inner jaws of the two parallel modules from inside out and secure
them with their R clips.
5.4.3.12
On the tail lift pendant, operate the LIFT DOWN switch to lower the pinning
operatives to the ground.
Operate the lift and traverse controls on the crane, and position the 1st parallel
5.4.3.13
module at 90 degrees across flatrack V2.
5.4.3.14
Disconnect the bridge module lifter from the lifting points on the outboard sides of
the 1st parallel module box sections.