TM 5-5420-280-10
0027 00
CHARGING PALLET BATTERIES USING CBT (Contd)
2. Turn main power switch (1) to ON position.
1
MAIN POWER SWITCH, ON POSITION
3. Start CBT (6) and run engine at high idle for approximately 15 minutes, then
stop engine. Refer to TM 9-2320-279-10.
4. Disconnect NATO slave power cable (5) from NATO slave receptacle (2) at CBT
(6) and pallet (3), and install dust cap (4) on each receptacle (2).
5. Power up RCU to verify batteries are charged. Refer to WP 0016 00.
6. Start LPU engine. Refer to WP 0015 00. If battery charge indicator light (8) on
APU control box (7) goes out after starting LPU engine, pallet batteries are
fully charged. If light (8) remains on after starting, run LPU engine until light
(8) goes out.
0027 00-2