TM 5-5420-280-10
0026 00
OPERATION OF CBT BACK-UP POWER FOR BRIDGE LAUNCH OR RETRIEVAL
(Contd)
12. Close transfer valve (3), by turning lever (1) until pointing to the left, once oil
level in sight gauge (2) reaches mark 1, 2, or 3 as determined in step 10.
2
1
3
TRANSFER VALVE, CLOSED POSITION
13. Move HIGH IDLE switch (4) to ON position and complete launch or retrieval.
4
14. Switch from CBT back-up power to LPU. Refer to WP 0015 00.
NOTE
Oil level in auxiliary reservoir sight gauge will take 24
hours or more to drain back to pallet main reservoir.
15. After completing launch or retrieval, check oil level in pallet main reservoir.
END OF WORK PACKAGE
0026 00-8