TM 5-5420-280-10
OPERATOR INSTRUCTIONS
RAPIDLY EMPLACED BRIDGE (REB)
CHARGING PALLET BATTERIES USING CBT
NOTE
If pallet electrical system is inoperable or LPU engine
will not crank when operating from pallet batteries
(pallet electrical system is not connected to CBT),
perform steps 1 through 6 to charge pallet batteries.
1. Remove dust cap (3) from NATO slave receptacle (1) at pallet (2) and CBT (5),
and connect NATO slave power cable (4) to each receptacle (1).
1
2
3
4
1
3
5