Google+
Facebook
LinkedIn
Twitter
Digg
StumbleUpon
Home
Download PDF
Order CD-ROM
Order in Print
INSTALL RHIB THROTTLE AND SHIFT CONTROL ASSEMBLY (cont) - TM-55-1945-205-24-2_855
RIGID HULL INFLATABLE BOAT THROTTLE SYNCHRONIZATION AND LINKAGE
TM-55-1945-205-24-2 Modular Causeway System (MCS) Roll-On/Roll-Off Discharge Facility Model (RRDF) RRDF-1 NSN 1945-01-473-2282 Manual
Page Navigation
716
717
718
719
720
721
722
723
724
725
726
TM 55-1945-205-24-2
0270 00 6
0270 00
WARNING
32. Apply electrical grease to three-socket plug (4) rubber seals.
33. Connect control receptacle (5) to three-socket plug (4).
WARNING
34. Apply electrical grease to six-socket plug (3) rubber seals.
35. Connect control receptacle (3) to six-socket plug (2).
36. Install tiedown straps as necessary.
37. Install RHIB battery negative lead terminal. (WP 0336 00)
38.
Perform operational check
of RHIB. (TM 55-1945-205-10-2)
END OF WORK PACKAGE
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business