Google+
Facebook
LinkedIn
Twitter
Digg
StumbleUpon
Home
Download PDF
Order CD-ROM
Order in Print
INSPECT COMBINATION BEACH/SEA END SECTION NON-POWERED MODULE FOR WATER - TM-55-1945-205-24-4_210
PRESSURE TEST COMBINATION BEACH/SEA END SECTION NON-POWERED MODULE - TM-55-1945-205-24-4_212
TM-55-1945-205-24-4 Modular Causeway System (MCS) Floating Causeway FC-1 NSN 1945-01-473-2162 Manual
Page Navigation
149
150
151
152
153
154
155
156
157
158
159
TM 55-1945-205-24-4
0060 00 1
0060 00
UNIT LEVEL MAINTENANCE
FLOATING CAUSEWAY
COMBINATION BEACH/SEA END SECTION
NON-POWERED MODULE
PRESSURE TEST
INITIAL SETUP:
Test Equipment
Test Set, Compartment Air (Item 50, WP 0253 00)
Tools
Tool Kit, General Mechanic’s (Rail and Marine) (Item 54, WP 0253 00)
Gloves, Chemical (Item 14, WP 0253 00)
Goggles, Industrial (Chipping, Chemical) (Item 17, WP 0253 00)
Compressor
, Unit, Reciprocating, Power Driver (Item 8, WP 0253 00)
Socket Wrench Set (Item 62, WP 0253 00)
Socket, Socket Wrench (Item 63, WP 0253 00)
Key, Socket Head Screw (Allen Wrench) (Item 64, WP 0253 00)
Materials/Parts
Compound, Sealing (Item 37, WP 0252 00)
Personnel Required
Engineer 88L
Equipment Condition
Combination Beach/Sea End Section Non-Powered Module Dry-Docked.
PRESSURE TEST COMBINATION BEACH/SEA END SECTION NON-POWERED MODULE
NOTE
The following procedure is typical for pressure testing all non-powered modules and for
pipe plug location.
1.
Remove test set (1), sensing line (2) and charging line extension hose (3) from storage box.