TM 55-1945-205-24-4
0208 00 1
0208 00
DIRECT SUPPORT MAINTENANCE
FLOATING CAUSEWAY
LIGHT TOWER - TOWER ASSEMBLY
REPLACEMENT
INITIAL SETUP:
Tools
Tool Kit, General Mechanics (Item 53, WP 0253 00)
Gloves, Mens and Womens (Leather Palm) (Item 16, WP 0253 00)
Goggles, Sun, Wind and Dust (Safety) (Item 18, WP 0253 00)
Helmet, Safety (Brown) (Item 20, WP 0253 00)
Life Preserver, Vest (Item 25, WP 0253 00)
Sling, Lifting, 5300 lbs (Green) (Item 48, WP 0253 00)
Shackle, ½ in. 2 Ton (Item 45, WP 0253 00)
Qty 2
Materials/Parts
Tube, Bottom
(33968)
PN 43210244
Tube, Middle
(33968)
PN 43210285
Tube, Top
(33968)
PN 43210251
Block, Shoring (Item 5, WP 0252 00)
Qty 2
Personnel Required
Engineer 88L
Equipment Condition
Light Tower Battery Negative Lead Terminal Removed. (WP 0131 00)
REMOVE LIGHT TOWER - TOWER ASSEMBLY
WARNING
All personnel must wear personal flotation device, hard hat, safety shoes and gloves
during FC operations and maintenance. Failure to observe these precautions could
result in serious injury or death.
1.
Remove retaining nut (1) and bolt (2) from the pivot pin (3).
