Google+
Facebook
LinkedIn
Twitter
Digg
StumbleUpon
Home
Download PDF
Order CD-ROM
Order in Print
LIGHT TOWER - TOWER ASSEMBLY - TM-55-1945-205-24-4_639
INSTALL LIGHT TOWER - TOWER ASSEMBLY - TM-55-1945-205-24-4_641
TM-55-1945-205-24-4 Modular Causeway System (MCS) Floating Causeway FC-1 NSN 1945-01-473-2162 Manual
Page Navigation
514
515
516
517
518
519
520
521
522
523
524
TM 55-1945-205-24-4
0208 00 2
0208 00
2.
Remove tower rest retaining pin (4) from tower rest (5).
3.
Attach sling and shackles to lift points (6) on tower assembly (7).
WARNING
4.
Using crane and sling to support weight of tower assembly (7), remove pivot pin (3) from tower support (8) and
tower pivot support (9).
WARNING
5.
Remove tower assembly (7) and place on wooden blocks.
6.
Remove sling from tower assembly (7).
7.
Remove light tower - tower cross bar. (WP 0211 00)
8.
Remove light tower - tower electrical cable shroud. (WP 0212 00)
9.
Remove light tower electrical system
junction box
electrical cable. (WP 0133 00)
10. Remove light tower pivot support (9). (WP 0206 00)
11. Remove light tower - tower extend winch. (WP 0210 00)
9
4
2
3
1
8
5
7
6
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business