• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
CRANKCASE BREATHER TEE AND REAR TUBE REPLACEMENT (Sheet 5 of 6)
MULTIPLE FLUID PRESSURE LINE CONNECTOR REPLACEMENT (Sheet 1 of 6)

Maintenance Manual For Launcher,Tank Chassis Transporting: For Bridge Armored-Vehicle-Launched: Scissoring-Type; Class 60 And 70 -2 Page Navigation
  140    141    142    143    144  145  146    147    148    149    150  
img
. . .
TM 5-5420-202-20-2
CRANKCASE BREATHER TEE AND REAR TUBE REPLACEMENT (Sheet 6 of 6)
NOTE
Perform step 11 through 15 only if your vehicle is equipped
with a 2DA engine.
11.
Install new hose (Q) and clamps (R) onto engine breather tube extension (S).
12.
Install end of engine breather tube extension (S) into hose (M). Install hose end of breather
tube extension (S) onto left ejector tube (T).
13.
Slide clamps (R) and (N) over hoses (M) and
(Q). Using screwdriver, tighten clamps (R)
and (N).
14.
Install clamp (U) onto engine breather tube
extension (S).
15.
Using two wrenches, install screw and
new self-locking nut (V) to secure clamp
(U) to bracket on left ejector tube (T).
16.
Install rear engine cooling fan (page 9-57).
17.
Install transmission shroud (page 9-6).
18.
Install top deck (page 16-23).
End of Task
6-100.2
Change 1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.