• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
ENGINE SHROUD SUPPORT REPLACEMENT - Continued
TURBOCHARGER SHROUDS REPLACEMENT - Continued

Maintenance Manual For Launcher,Tank Chassis Transporting: For Bridge Armored-Vehicle-Launched: Scissoring-Type; Class 60 And 70 -2 Page Navigation
  664    665    666    667    668  669  670    671    672    673    674  
img
. . . . . . . . .
TM 5-5420-202-20-2
TURBOCHARGER SHROUDS REPLACEMENT (Sheet 1 of 5)
PROCEDURE INDEX
PROCEDURE
PAGE
Inner Shroud Replacement
9-41
Outer Shroud Replacement
9-45
Upper Shroud Replacement
9-46
Inner Shroud Replacement (Sheet 1 of 3)
PROCEDURE
PAGE
Removal
941
9-43
Installation
TOOLS:
11/16 in. combination box and open end wrench
1/2 in. combination box and open end wrench
1 / 2  in.  socket  with  1/2  in.  drive
5 in. extension with 1/2 in. drive
R a t c h e t with 1/2 in. drive
Remove powerplant (page 5-2)
P R E L I M I N A R Y PROCEDURES:
Remove rear engine shroud support (page 9-39)
Remove transmission oil cooler lines (page 6-64 or 6-68)
Go on to Sheet 2
9-41


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.