• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
COOLING FAN SHROUD REPLACEMENT - Continued
ENGINE COOLING FAN REPLACEMENT - Continued

Maintenance Manual For Launcher,Tank Chassis Transporting: For Bridge Armored-Vehicle-Launched: Scissoring-Type; Class 60 And 70 -2 Page Navigation
  678    679    680    681    682  683  684    685    686    687    688  
img
. . .
TM 5-5420-202-20-2
ENGINE COOLING FAN REPLACEMENT (Sheet 1 of 4)
PROCEDURE INDEX
PAGE
PROCEDURE
9-55
Removal
9-57
Installation
Thickness gage (feeler gage)
TOOLS:
Torque wrench (0-175 lb-ft)
Ratchet with 1/2 in. drive
9/16 in. socket with 1/2 in. drive
1/2 in. socket with 1/2 in. drive
1/2 in. combination box and open end wrench
Slip joint pliers
Hammer
1-1/4 in. socket with 1/2 in. drive
Cotter pin MS24665-359
SUPPLIES:
Cotter pins TR50-80 (16 required)
2 x 4 in. block of wood 6 in. long
Remove top deck (page 16-21)
PRELIMINARY
PROCEDURE:
Do not drop screws and Iockwashers into fan assembly.
Go on to Sheet 2
9-55


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.