• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Bilge Pump Switch And Indicator Light Replacement (Sheet 4 of 4)
Circuit Breaker Replacement (Sheet 2 of 7)

Maintenance Manual For Launcher,Tank Chassis Transporting: For Bridge Armored-Vehicle-Launched: Scissoring-Type; Class 60 And 70 -3 Page Navigation
  69    70    71    72    73  74  75    76    77    78    79  
img
. . . . . . . . . .
TM 5-5420-202-20-3
MASTER CONTROL PANEL REPAIR (Sheet 33 of 73)
Circuit Breaker Replacement (Sheet 1 of 7)
PROCEDURE INDEX
PROCEDURE
PAGE
Removal Circuit Breakers (A,B,C, and E)
10-71
Installation Circuit Breakers (A,B,C, and E)
10-71
Removal Circuit Breaker (D)
10-72
Installation Circuit Breaker (D)
10-73
Removal Circuit Breaker (F)
10-74
Installation Circuit Breaker (F)
10-75
Removal Circuit Breaker (G)
10-76
Installation Circuit Breaker (G)
10-76
TOOLS:
3/8 in. socket with 1/2 in. drive
4 in. flat-tip screwdriver
Ratchet with 1/2 in. drive
Cross-tip screwdriver
11/32 in. wrench
SUPPLIES:
Silicone compound (Item 32, Appendix D)
Lockwashers
PRELIMINARY PROCEDURE: Remove panel from vehicle (page 10-34).
NOTE
There are seven circuit breakers located
in the master control panel.  Five cir-
cuit breakers (gas particulate (A),
IR (night vision), power (B), fuel shut-
off (C), fuel pump (D) and bilge pump
and utility outlet (E)) are replaced by
r e m o v i n g mounting screws from the
front of the panel. Two circuit break-
ers (gage (F) and manifold preheat (G)
a r e replaced by removing mounting
screws from the rear of the panel.
Go on to Sheet 2
TA249011
10-70


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.