• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
LEFT AND RIGHT FINAL DRIVE REPLACEMENT - Continued
FINAL DRIVE AIR PRESSURE RELIEF VALVE (LEFT AND RIGHT) REPLACEMENT

Maintenance Manual For Launcher,Tank Chassis Transporting: For Bridge Armored-Vehicle-Launched: Scissoring-Type; Class 60 And 70 -3 Page Navigation
  568    569    570    571    572  573  574    575    576    577    578  
img
. . . . . .
TM 5-5420-202-20-3
LEFT AND RIGHT FINAL DRIVE REPLACEMENT (Sheet 4 of 4)
16. Using 3/16 inch allen wrench, remove plug
(K) from left final drive.
17. Using adjustable wrench, install tee (L) into
left final drive where plug (K) was.
Left Side
18.
Using fingers connect tube assembly (M) and tubing (J) to tee (L).
19. Using torque wrench and crowfoot wrench, tighten tubing (J) nut 75-85 lb-in (8.4-9.5 Nm).
20.
Using torque wrench and crowfoot wrench, tighten tubing assembly (M) nut 75-85 lb-in
(8.4-9.5 Nm).
Install final drive air pressure valve (page 12-6).
21.
Install track drive sprocket (page 14-77).
22.
Install adapter assembly (page 12-8).
23.
24.
Install powerplant guides (page 6-3).
Fill final drive with oil (LO 5-5420-202-12).
25.
Drive vehicle to perform operational check (TM 5-5420-202-10).
26.
End of Task
12-5
Change 4


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.