TM 5-5420-202-20-3
BELLCRANK REPLACEMENT (Sheet 1 of 4)
PROCEDURE INDEX
PROCEDURE
PAGE
Removal
Installation
TOOLS: 9/16 in. combination box and open end wrench
Torque wrench with 1/2 in. drive (0-175 lb-ft) (0-237
Long round nose pliers (needle nose)
Bench vise
Vise jaw caps
1 lb. hammer
Punch drive pin 3/8 in. dia.
9/16 in. socket with 1/2 in. drive
SUPPLIES:
Bushing
PRELIMINARY
PROCEDURES:
Remove transmission shroud (page 9-2).
Using pliers, remove cotter pin (A) and
1.
flat washer (B) from pin (C).
Remove pin (C) from bellcrank (D).
2.
TA249512
Go on to Sheet 2