• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
TOP DECK FRAME ASSEMBLY REPLACEMENT - Continued
TOP DECK FRAME ASSEMBLY REPLACEMENT - Continued

Maintenance Manual For Launcher,Tank Chassis Transporting: For Bridge Armored-Vehicle-Launched: Scissoring-Type; Class 60 And 70 -3 Page Navigation
  942    943    944    945    946  947  948    949    950    951    952  
img
TM 5-5420-202-20-3
TOP DECK FRAME ASSEMBLY REPLACEMENT (Sheet 8 of 10)
Top Deck Insulator Panel Replacement (Sheet 2 of 4)
Swing hoist about 1 foot in direction
4.
of arrows, slowly lower end (D) of top
deck (E) until top deck is resting on
its top.
Remove two hoist chains from end
5.
of top deck (E).
Go on to Sheet 3
TA249701
16-28


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.