• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
TOP DECK FRAME ASSEMBLY REPLACEMENT - Continued
TOP DECK FRAME ASSEMBLY REPLACEMENT - Continued

Maintenance Manual For Launcher,Tank Chassis Transporting: For Bridge Armored-Vehicle-Launched: Scissoring-Type; Class 60 And 70 -3 Page Navigation
  943    944    945    946    947  948  949    950    951    952    953  
img
.
TM 5-5420-202-20-3
TOP DECK FRAME ASSEMBLY REPLACEMENT (Sheet 9 of 10)
Top Deck Insulator Panel Replacement (Sheet 3 of 4)
Using 9/16 inch socket, remove 32 screws
(P), lockwashers (Q), and flat washers
(R) holding insulator panel (S) to top
deck (E).
Manually remove insulator panel (S)
and seals (T and U) from top deck (E).
INSTALLATION:
1.
Manually position insulator panel (A)
and seals (B and C) into top deck (D).
2.
Using drift pin to line up screw holes,
use 9/16 inch socket to install 32 screws
(E), lockwashers (F), and flat washers
(G) to hold insulator panel (A) to top
deck (D).
TA249702
G  O on to Sheet 4
16-29


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.