POWER TAKEOFF REPAIR (Sheet 1 of 8)
PROCEDURE INDEX
PROCEDURE
PAGE
I
Disassembly
3-14
Cleaning and Inspection
3-18
Assembly
3-18
TOOLS:
7/16 in. socket with 1/2 in. drive
External retaining ring pliers
1/2 in. socket with 1/2 in. drive
Brass punch
Hammer
Flat-tip screwdriver
Putty knife
Arbor press
Internal retaining ring pliers
Stud remover/installer
Engine lubricating oil (Item 17,
SUPPLIES:
Gasket
1/4-NC x 1 capscrew (jackscrew)
Preformed packing
(2 required)
Seal
Dry cleaning solvent (Item 12,
Wood block - 2 in. x 4 in.
x 12 in. long (2 required)
Studs (as required)
Self-locking nut (8 required)
PRELIMINARY PROCEDURE: Remove power takeoff assembly (page 3-2)
NOTE
Removal of studs (disassembly steps 3 and 11) and
installation of studs (assembly steps 7, 17, and 19) may
be omitted if studs are not damaged.
Go on to Sheet 2