TM 5-5420-202-34
TRANSMISSION REPLACEMENT (Sheet 1 of 23)
PROCEDURE INDEX
PAGE
PROCEDURE
6-19
Removal
6-29
Cleaning
6-29
Installation
3/4 in. socket with 1/2 in. drive
TOOLS:
1/2 in. combination box and
Universal joint with 1/2 in. drive
open end wrench (2 required)
5 in. extension with 1/2 in. drive
9/16 in. combination box and
1-1/8 in. socket with 3/4 in. drive
open end wrench (2 required)
3/4 in. combination box and
8 in. adjustable wrench
open end wrench
7/8 in. combination box and
Torque wrench with 3/4 in drive (0-600 lb-ft)
open end wrench
0-813 Nm)
15/16 in. combination box and
Flat-tip screwdriver
open end wrench
Slip joint pliers
1-1/2 in. open end wrench
Hose clamp pliers
1-5/8 in. open end wrench
Snap ring pliers
1/2 in. socket with 1/2 in. drive
9/16 in. socket with 1/2in. drive
Putty knife
5/8 in. socket with 1/2 in. drive
Pry bar
Hoist (5,000 pounds)
SPECIAL TOOLS:
Slide hammer puller (Item 3, Chapter 2, Section I)
Pinion turning wrench (Item 5, Chapter 2, Section I)
FABRICATED TOOLS: Fabricated wrench (Fig. 1, Appendix D)
Gasket (2 required)
SUPPLIES:
Drain pan (suitable container)
Cotter pins (2 required)
Preformed packing
Wooden blocks, 10 x 10 x 12 in.
Dry cleaning solvent (Item 12,
(2 required)
Metallic gasket (4 required)
PERSONNEL: Two
REFERENCES:
TM 5-5420-202-20
LO 5-5420-202-12
PRELIMINARY PROCEDURE:
Remove engine shroud and supports (TM
5-5420-202-20)
Go on to Sheet 2
Change 2
6-19