ARMY TM 5-5420-212-10-1
MARINE CORPS TM 08676A-10/1-1
(10) Connect second heavy nose section (2N1) to first heavy nose section.
(11) Lift gravity catch, remove panel pin, and push nose forward until center vertical in first heavy nose section is close
to anchorage holes in nose roller.
(a) If nose is uphill, move nose forward until center vertical is in front of nose roller. Put panel pin through nose
roller and behind center vertical.
(b)
If nose is downhill, move nose to rear until center vertical is behind nose roller. Put panel pin through nose
roller and in front of center vertical.
NOTE
Do not remove this pin until another nose section Is attached and the nose crew has hands on the
nose to prevent It from rolling.
(12) Add further heavy launching noses as described in step (10). After each nose is added boom 10 ft forward and
secure with panel pin as described in step (11).
4-41