ARMY TM 5-5420-212-10-1MARINE CORPS TM 08676A-10/1-1(12) Support nose, lift gravity catch, remove panel pin from nose roller and move nose forward until anchorage tube oflower nose section of 2N2 is aligned with holes in nose roller.CAUTIONCenter verticals of nose sections must be aligned. Failure to do so may result In damage to nosesections.NOTECenter crew will hold nose In this position until panel pin and first nose link is in place.4-44
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business