ARMY TM 5-5420-212-10-1MARINE CORPS TM 08676A-10/1-1(4)Put upper nose section (1 N2) of double story nose on top of first lower nose (1N2).(5)Support nose, lift gravity catch, remove pin from anchorage tube and move nose forward until the vertical of sixthnose section is in front of holes in nose roller. Insert panel pin through holes in nose roller and allow nose to seatagainst this pin. DO NOT put the panel pin through the anchorage tube.(6)If a second LRP Mk 2 is available, place it on heavy nose (6N1) at this time.(a)Put one 20T jack (ram fully extended) in LRP, standing upright.(b)Put two pieces of packing on LRP.(c)Lift LRP onto one girder of bridge and slide along bankseat beam and lift onto nose.(d)Secure LRP to nose with cargo tie-down strap.(7Connect second lower nose section (2N2) to first lower nose section (1N2). DO NOT move nose at this time.(8)Put upper nose section (2N2) of double story nose on top of lower nose section (2N2).(9)Support nose, lift gravity catch, remove panel pin from nose roller and move nose forward until front vertical offirst double story nose sections (1N2) is in front of holes in nose roller. Insert panel pin through holes in noseroller and allow nose to seat against this pin. DO NOT put pin through the anchorage tube.(10) Connect third lower story nose section (3N2) to second lower nose section (2N2). DO NOT move nose at thistime.(11) Put upper nose section (3N2) of double story nose on top of lower nose section (3N2).4-43
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business