ARMY TM 5-5420-212-10-1
MARINE CORPS TM 08676A-10/1-1
TABLE 6-7. (contd) Building and Boom Table - 2E + 10 through 2E + 12 Bay Double Story
(Restricted Site)
Bridge ft
90
96
102
Length m
27.4
29.3
31.1
2E + No. of Bays
10
11
12
L/Nose
6N1
7N1
7N1
8N1
7N1
8N1
Launch Add
11p4
E
Complete By:
Note c,d
Note c,d
Note c,d
Note c,d
Note c,d
Note c,d
NOTES:
a.
Add LNCG posts, LNCG and nose roller.
b.
Check LR is under LZ given or higher. Remove nose sections as they pass LRP, observing minimum 5 ft (1.5
m) overhang. Leave last three nose sections in place until far bank end of bridge has been lowered to
ground.
c.
Launch until far bank end of bridge is 9 in (23 cm) from LRP, or end of ETP overhangs CRB by 1.5 ft (0.5 m).
d.
Put bridge on ground.
*
Add given length of launching nose with LRP secured with tie down strap.
**
Nose completed by adding 8th LNH.
( )
Center of gravity
6-10