ARMY TM 5-5420-212-10-1MARINE CORPS TM 08676A-10/1-1TABLE 6-7. (cont’d) Building and Boom Table - 2E + 10 through 2E + 12 Bay Double Story(Restricted Site)Bridge ft9096102Length m27.429.331.12E + No. of Bays101112L/Nose6N17N17N18N17N18N1Launch Add11p4EComplete By:Note c,dNote c,dNote c,dNote c,dNote c,dNote c,dNOTES:a.Add LNCG posts, LNCG and nose roller.b.Check LR is under LZ given or higher. Remove nose sections as they pass LRP, observing minimum 5 ft (1.5m) overhang. Leave last three nose sections in place until far bank end of bridge has been lowered toground.c.Launch until far bank end of bridge is 9 in (23 cm) from LRP, or end of ETP overhangs CRB by 1.5 ft (0.5 m).d.Put bridge on ground.*Add given length of launching nose with LRP secured with tie down strap.**Nose completed by adding 8th LNH.( )Center of gravity6-10