ARMY TM 5-5420-212-10-1MARINE CORPS TM 08676A-10/1-1TABLE 6-8. Delaunch Table - 2E + 1 through 2E + 6 Bay Double Story (Normal Site)Bridge ftLength m3611.04212.84814.65416.56018.36620.12E + No. of Bays123456L/Nose2N13N13N13N14N14N1V Distanceft38455155.86369m11.613.715.517.019.221.0BuildNotes a,b,and c,Notes a,b,and dNotes a,b,and dNotes a,b,and dNotes a,b,d and eNotes a,b, dand eDelaunch AddDp2RRBDp2RRBDp2RRBDp2RRBDp2RRBDp2RRBDelaunch Recover(1p0)LRP(1p2)LRP(1p6)LRP(2p3)LRP(2p5)LRP(3p1)LRPBoom Remove(CG)4p0E(1p6)Boom Remove(CG)2p4E(Bp0)3p0E(Ap2)3p0E and5(Ap2)3p06 and 5(Ap2)BoomRemove(CG)Remove1p2E(Bp7)2N1*1p6E(Bp5)3N1*21p23N1*3,21p24(Bp0)3N1*3,21p24(Bp2)4N1*3,21p24(Bp2)4N1*3,2BoomRemoveBp21,EBp21,EBp21,EBp21,EBp21,EBp21,EComplete By:Note fNote fNote fNote fNote fNote fNOTES:a.Remove curbs, decks and ramps and position FRB under bridge min. 1.5 ft (0.5 m) from end.b.Position center of LR (in LRP) 8 ft (2.4 m) from BSB. Add LNCG posts, LNCG and nose roller.c.For 2E + 1 only. Add 2 LNH and LLN.d.For 2E + 2 through 2E + 12,add 3 LNH. Reposition LRP [base 9 in (23 cm) from BSB].e.Add remaining nose sections, observing minimum 5 ft (1.5 m) overhang.f.Disassemble FRB and RRB. Clear site.*Remove entire launching nose, LNCG, LNCG posts and nose roller.( )Center of gravity.6-11
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business