ARMY TM 5-5420-212-10-1MARINE CORPS TM 08676A-10/1-1TABLE 6-18. Delaunch Table - 2E + 7 through 2E + 9 Bay Double Story (Restricted Site)Bridge ft727884Length m21.923.825.62E + No. of Bays789L/Nose5N16N16N17N16N17N1V Distance ft (m)75 (22.9)75 (22.9)81 (24.7)81 (24.7)87 (26.5)87 (26.5)BuildNotesNotesNotesNotesNotesNotesa,b,c,da,b,c,da,b,c,da,b,c,da,b,c,da,b,c,dDelaunch7p47p48p48p49p49p4RemoveEEEEEEDelaunch6p47p47p48p48p4Remove78899Delaunch5p46p46p47p4Remove6778Delaunch4p45p46p4Remove567Delaunch4p45p4Remove56Delaunch5p42p44p42p46p43p4AddRRBRRBRRBRRBRRBRRBDelaunch(2p0)(Bp2)(1p2)(Bp5)(2p3)(Bp0)RecoverLRPLRPLRPLRPLRPLRPBoom3p71p73p04p02p1Remove74685(CG)(1p4)(Bp7)(Ap2)(1p6)(Bp5)Boom3p22p43p4Remove657(CG)(1p0)(Bp2)(1p2)Boom2p21p73p0Remove5,446(CG)(Bp4)(Bp7)(Ap2)Boom1p7Remove5 and 4(CG)(Bp7)Boom1p21p21p21p21p21p2Remove5N1*,3,26N1*,3,26N1*,3,24,7N1*,3,26N1*,3,24,7N1*,3,2BoomBp2Bp2Bp2Bp2Bp2Bp2Remove1,E1,E1,E1,E1,E1,EComplete By:Note eNote eNote eNote eNote eNote eNOTES:a.Remove curbs, decks and ramps and position FRB under bridge min 1.5 ft (0.5 m) from the end.b.Position center of LR (in LRP) 8 ft (2.4 m) from BSB.c.Add LNCG posts, LNCG and nose roller. Add 3 LNH. Reposition LRP [base 9 in (23 cm) from BSB].d.Add remaining nose sections, observing minimum 5 ft (1.5 m) overhang.e.Disassemble FRB and RRB. Clear site.*Remove entire launching nose, LNCG, LNCG posts and nose roller.( )Center of gravity.6-21
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business