ARMY TM 5-5420-212-10-1MARINE CORPS TM 08676A-10/1-1(52) Continue launch until either far bankseat beam approaches within 6 ft (1.8 m) of A peg or the near bankend of bridge is within 1.5 ft (0.5 m) (2 panel points) of center of capsill roller beam rollers. Stop launchwhen one of the above is met.(53) Continue launch until near bank bankseat beam is 1.5 ft (0.5m) (2 panel points) from the center of thecapsill roller beam rollerNOTEThe front roller beam will now be used to jack the bridge to enable the capsill roller beam to beremoved. The front roller beam will now be called ex FRB.(54) Install ex FRB under bridge between capsill roller beam and A peg, with its baseplates next to capsillroller bridge baseplates. Ensure ex FRB is centered under bridge and at 900 to centerline.7-21