(52) Continue launch until either far bankseat beam approaches within 6 ft (1.8 m) of A peg or the near bank
end of bridge is within 1.5 ft (0.5 m) (2 panel points) of center of capsill roller beam rollers. Stop launch
when one of the above is met.
(53) Continue launch until near bank bankseat beam is 1.5 ft (0.5m) (2 panel points) from the center of the
capsill roller beam roller
NOTE
The front roller beam will now be used to jack the bridge to enable the capsill roller beam to be
removed. The front roller beam will now be called ex FRB.
(54) Install ex FRB under bridge between capsill roller beam and A peg, with its baseplates next to capsill
roller bridge baseplates. Ensure ex FRB is centered under bridge and at 900 to centerline.
7-21