ARMY TM 5-5420-212-10-1
MARINE CORPS TM 08676A-10/1-1
(9)
Lower bridge evenly onto ex FRB. Ensure rollers are locked.
(10) Remove either jacks, crane, or davits with jacking brackets and pullers. If vehicle was used, move
backward about 25 ft (7.6 m) from end of bridge. Transfer thirty two deck units and six curbs to near
bank end of bridge to complete counterweight.
(11) Assemble and position capsill roller beam (CRB) over centerline at 9ft. (2.7m) from A peg. Capsill roller
beam should be set at a height that will permit end of bridge to pass over it during next delaunch.
Ensure center of capsill roller beam is over centerline of bridge, and ensure that the capsill roller beam is
at 90 to centerline of bridge.
CAUTION
The following cautions must be observed each time the bridge is delaunched. Do not allow the
vehicle to drift right or left of centerline. Keep vehicle straight and in line with bridge. Movement
of bridge to right or left can cause damage to roller beams.
(12) Connect vehicle to bridge with a long push bar (para. 4-18c).
(13) Fit launching nose roller to far bank bankseat beam (para. 4-10).
7-26