Remove packing and nose section from under launching nose.
(g)
Position spare landing roller pedestal under launching nose 12 ft (3.7 m) from A peg.
(h)
Operate hydraulic jack until this landing roller pedestal is fully raised and remove first landing roller
pedestal from under nose.
(i)
Operate hydraulic jack in first landing roller pedestal to lower it complete. Remove from site.
(60) Continue launch until far bank bankseat beam is over far bank, and the required bearing is reached.
[For 22 bay minimum bearing is 5.25 ft (1.6 m)].
(61) Lock rollers on ex FRB.
(62) Lower far bank end of bridge by operating jack in landing roller pedestal. Reposition landing roller
pedestal so the center of roller is 8 ft (2.4 m) from nose roller on bankseat beam. Raise landing roller
pedestal until roller touches bottom of launching nose.
7-23