• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
THERMOSTATIC ENGINE OIL COOLER VALVE ASSEMBLY (LEFT AND RIGHT) REPLACEMENT - Continued
ENGINE OIL COOLER REPLACEMENT

M48A5 Tank Chassis, Transporting: For Bridge, Armored-Vehicle-Launched; Scissoring Type, Class 60 -2 Page Navigation
  56    57    58    59    60  61  62    63    64    65    66  
img
. . . . . . . .
TM 5-5420-226-20-2
THERMOSTATIC ENGINE OIL COOLER VALVE ASSEMBLY (LEFT AND RIGHT)
REPLACEMENT (Sheet 4 of 4)
INSTALLATION:
NOTE
If replacing valve assembly, the engine oil cooler bypass
valve also has to be replaced. Go to page 6-13 for replacement.
1.
Using low-pressure compressed air, dry valve.
Install new spacer ring (A) on valve (B).
2.
Seat threads of valve (A) in engine oil cooler socket (C) by hand.
3.
Using wrench, tighten valve (B).
4.
Replace left engine cooler (if required) (page 6-19).
5.
Replenish lubricating oil lost during valve assembly replacement (LO 5-5420-226-12)
6.
7.
Check engine oil level indicator gage rod (TM 5-5420-226-10).
Perform ground hop (page 5-25).
8.
Disconnect ground hop equipment (page 5-30).
9.
10.
Install powerplant (page 5-14).
TA107488
End of Task
6-18


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.