• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
LOWER OIL FILLER TUBE AND HOSE REPLACEMENT
TURBOSUPERCHARGER OIL DRAIN TUBE (RIGHT BANK) REPLACEMENT

M48A5 Tank Chassis, Transporting: For Bridge, Armored-Vehicle-Launched; Scissoring Type, Class 60 -2 Page Navigation
  127    128    129    130    131  132  133    134    135    136    137  
img
.
TM 5-5420-226-20-2
LOWER OIL FILLER TUBE AND HOSE REPLACEMENT (Sheet 2 of 2)
INSTALLATION:
1.
Push hose (A) over tube assembly (B).
2.
Position clamp (C) over tube assembly (B) end
of hose (A).
3.
Using 5/16 inch socket, tighten nut of clamp
(c).
Place clamp (D) loosely over hose (A) with clamp
4.
nut facing you.
Place assembled parts (A through D) in position
5.
on powerplant.
6.
Push end of hose (A) over upper tube end (E).
7.
Position new gasket (F) and tube assembly
(B) on powerplant port.
Place lockwashers (G) on three screws (H).
8.
Insert three screws (H) in flange of tube assembly
9.
(B) and tighten finger tight.
10.
Using 1/2 inch wrench, tighten screws (H).
11.
Position clamp (D) on hose (A) over end of
upper tube end (E).
12.
Using 5/16 inch socket, tighten nut of clamp
(D).
13.
Install powerplant (page 5-14).
End
of
Task
TA107558
6-89


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.