• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
ACCELERATOR PEDAL ASSEMBLY REPLACEMENT - Continued
ACCELERATOR CONTROL ROD REPLACEMENT - Continued

M48A5 Tank Chassis, Transporting: For Bridge, Armored-Vehicle-Launched; Scissoring Type, Class 60 -2 Page Navigation
  542    543    544    545    546  547  548    549    550    551    552  
img
. . . . .
TM 5-5420-226-20-2
ACCELERATOR CONTROL ROD REPLACEMENT (Sheet 1 of 5)
PROCEDURE INDEX
PROCEDURE
PAGE
Removal
7-346
7-348
Cleaning and Inspection
7-349
Installation
7/16 in. socket with 3/8 in. drive
TOOLS:
9/16 in. socket with 3/8 in. drive
3/8 in. drive ratchet handle
Slip joint pliers
Ball peen hammer
3/8 in. dia. drive punch
Retaining ring pliers
Vise
SUPPLIES:
Clean rags (Item 12, Appendix D)
Dry cleaning solvent (Item 55, Appendix D)
Remove throttle control handle assembly (page 7-365)
PRELIMINARY PROCEDURE:
REMOVAL:
1. Using 9/16 inch socket and ratchet.
remove two screws, lockwashers,
and flat washers (A).
TA108052
Go on to Sheet 2
7-346


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.