• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
ACCELERATOR THROTTLE LINKAGE REPLACEMENT - Continued
ACCELERATOR THROTTLE LINKAGE REPLACEMENT - Continued

M48A5 Tank Chassis, Transporting: For Bridge, Armored-Vehicle-Launched; Scissoring Type, Class 60 -2 Page Navigation
  553    554    555    556    557  558  559    560    561    562    563  
img
TM 5-5420-226-20-2
ACCELERATOR THROTTLE LINKAGE REPLACEMENT (Sheet 7 of 9)
Connect link (L) to connecting link (B).
9.
Insert straight pin (M) through assembled
10.
links.
Using pliers, install new cotter Pin (N)
11.
to straight pin (M).
Screw nut (P) onto rod (Q).
12.
Place rod (Q) into holding bracket (R).
13.
Screw smaller of remaining clevises (S)
14.
on rod (Q) the same number of turns re-
corded for removal.
Using torque wrench and crowfoot attachment,
15.
tighten nut (P) between 6-8 lb-ft (8.13-10.81 N m)
while holding clevis (S) with
pliers.
Install clevis (S) to bellcrank lever (D).
16.
Insert straight pin (T) into clevis (S).
Using pliers, install new cotter pin (U)
17.
to straight pin (T).
TA108063
Go on to Sheet 8
7-357


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.