• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
ACCELERATOR THROTTLE LINKAGE REPLACEMENT - Continued
ACCELERATOR THROTTLE LINKAGE REPLACEMENT - Continued

M48A5 Tank Chassis, Transporting: For Bridge, Armored-Vehicle-Launched; Scissoring Type, Class 60 -2 Page Navigation
  554    555    556    557    558  559  560    561    562    563    564  
img
TM 5-5420-226-20-2
ACCELERATOR THROTTLE LINKAGE REPLACEMENT (Sheet 8 of 9)
Install flat washer (V), spring (W), and clamp (X) on rod (Q). Make sure clamp (X) is
18.
on scribe mark on rod (Q).
19.
Using 7/16 inch wrench, install screw (Y) and lockwasher (Z) in clamp (X).
Screw nut (AA) onto rod ((Q).
20.
21.
Screw clevis (AB) to same number of
turns recorded for removal on rod (Q).
Using torque wrench and crowfoot attach-
22.
ment, tighten nut (AA) between 6-8 lb-ft
(8.13-10.81 Nm) while holding clevis
(AB) with pliers.
23.
Using 1/2 inch wrench, install nut (AC) on
tube (AD).
24.
Using 7/16 inch wrench, install rod end
(AE) on tube (AD).
Go on to Sheet 9
TA108064
7-358


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.